Booster assembly flow test reports
Brigade booster tests are the ones building managers remember — and the ones that still live in a five-year folder. The report should read as a booster test, not a hydrant sheet with the title changed.
Who it is for
Contractors doing periodic booster checks and the five-yearly booster assembly flow test under AS 1851 Section 4.
What happens on the day
Inlets, outlets, pressures and the flow you measured at the booster. Photos of the cabinet and the connections. Signatures on site.
Standards
AS 1851:2012 Section 4, including five-yearly booster assembly testing. Commissioning work can reference AS 2419.1 where that is the brief.